Prescott National Forest Fire Center Ramp Reseal and Crack Repair

Posted Date: Jul 22, 2026
Aug 12, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12363N26Q4207 Prescott National Forest Fire Center Ramp Reseal and Crack Repair
Synopsis

This project consists of providing all materials, equipment, labor, transportation,
mobilization/demobilization, and incidentals for crack sealing and applying Fog Seal (emulsified
asphalt seal coat) to the asphalt at the Prescott Fire Center airtanker base/ light fixed wing ramp
and helibase.


Before Fog Seal is applied, all existing asphalt and concrete tarmac markings on the airtanker base
ramp and helibase will require Hydro Blasting to completely remove all markings and striping.
Before removing all markings and striping, contractors are encouraged to take photos and
dimensions of all existing markings and striping. Note: The Contractor shall be responsible for
accurate field measurements all striping and markings before their replacement. All replaced
striping and markings

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙