SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W911S225U0731 | Prefabricated Rail Timber Crossing Panels | |
Synopsis | ||
Prefabricated Timber Crossing Panels for 11 rail crossings. Prefabricated panels are required for Maintenance-of-Way personnel to replace cross-ties under the rail crossings. The cross-ties hold the track in gauge (56-1/2 inches). Panels must be fit for 100-lb RE rail placed on 10-ft cross-ties. Prefabricated Timber Crossing Pannels should be full depth creosote-treated hardwood timber crossing panels used in railroad crossings. The timber panels layover the rail and ties to let passenger vehicles cross. The panels require detailed cuts, notching, beveling, and drilling to perfectly fit inside the rail gauge and outside on the rail field side. The timbers shall be .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |