| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9128F25RA043 | Power Independence, Mission Control Station (PIMCS), Buckley Space Force Base (SFB), Colorado (CO) | |
| Synopsis | ||
|
Power Independence, Mission Control Station, Buckley Space Force Base, Colorado - Am-0006:: The purpose of this amendment is to update the specifications/drawings, DIV 00 21 00 and DIV 00 22 00. There is no change to the proposal due date, proposals are due 21 November 2025 at 1400 Central Time. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9128F25RA043 | Power Independence, Mission Control Station (PIMCS), Buckley Space Force Base (SFB), Colorado (CO) | |
| Synopsis | ||
|
Power Independence, Mission Control Station, Buckley Space Force Base, Colorado - Am-0005: The purpose of this amendment is to update the specifications/drawings and extend the proposal due date to 21 November 2025 at 1400 Central Time. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9128F25RA043 | Power Independence, Mission Control Station (PIMCS), Buckley Space Force Base (SFB), Colorado (CO) | |
| Synopsis | ||
|
Construct all necessary facilities to provide utility and backup power to the Space-Based InfraRed Systems (SBIRS) mission in Building 442. Facilities to be constructed include a new power plant (B451) to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power; new transformers; medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in Building 433; and all necessary support. Provide full load capability of 3.2MW after derating for operations and environmental factors with redundant capacity components to maintain the power resiliency required by the mission. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9128F25RA043 | Power Independence, Mission Control Station (PIMCS), Buckley Space Force Base (SFB), Colorado (CO) | |
| Synopsis | ||
|
Construct all necessary facilities to provide utility and backup power to the Space-Based InfraRed Systems (SBIRS) mission in Building 442. Facilities to be constructed include a new power plant (B451) to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power; new transformers; medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in Building 433; and all necessary support. Provide full load capability of 3.2MW after derating for operations and environmental factors with redundant capacity components to maintain the power resiliency required by the mission. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9128F25RA043 | Power Independence, Mission Control Station (PIMCS), Buckley Space Force Base (SFB), Colorado (CO) | |
| Synopsis | ||
|
Construct all necessary facilities to provide utility and backup power to the Space-Based InfraRed Systems (SBIRS) mission in Building 442. Facilities to be constructed include a new power plant (B451) to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power; new transformers; medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in Building 433; and all necessary support. Provide full load capability of 3.2MW after derating for operations and environmental factors with redundant capacity components to maintain the power resiliency required by the mission. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |