| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 52000PR260003023 | Port Engine Removal / Install | |
| Synopsis | ||
|
Contractor shall provide general labor, equipment, crane services, specialty material, and facilities to conduct port engine replacement on 47224. Remove the vessel from the water, conduct all necessary work for the removal of the old port engine and all applicable auxiliary systems IAW all applicable Coast Guard Drawings, Maintenance Procedure Cards, and Technical Publications, and install new Coast Guard provided port engine. Contractor shall swap over all associated parts necessary from the old engine, onto the new engine. Once new engine is installed, place vessel back into the water and conduct sea trials with Coast Guard representatives onboard. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |