SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9123725QA061 | Pave Parking Area at John W. Flannagan Dam and Reservoir | |
Synopsis | ||
The contractor shall provide all materials, equipment, labor, layouts of work features, and supervision needed to complete paving.Project construction will generally consist of the following items of work:? The Contractor shall apply a tack coat conforming to VDOT Item 310-1 on all areas to be resurfaced. Tack coat shall be placed at 0.10 gallons per square yard. ? The Contractor shall place a 2 inch surface course of asphalt concrete pavement on all areas, surface course must conform to VDOT Item 315-1. Asphalt will begin at the entrance to the project office from main road and shall continue up .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9123725QA061 | Pave Parking Area at John W. Flannagan Dam and Reservoir | |
Synopsis | ||
Pave Parking Area at John W. Flannagan Dam and Reservoir .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |