| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| PR15809685 | Paramaribo/roof top unit replacement | |
| Synopsis | ||
|
The project is described as “Warehouse, Shop and Gym HVAC equipment Replacement”. The United States Department of State (DOS) requires engineering and construction services to remove and replace three (3) curb mounted roof top units (RTU’s) installed on the warehouse, Workshop and Gym at the U.S Embassy Compound in Paramaribo Suriname. The buildings are one (1) story buildings located around the perimeter of the compound. The intent is for the new RTU’s to fit on the existing to remain RTU curbs. The contractor shall remove and properly dispose of demolished equipment and materials or otherwise instructed by COR or Facility .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| STATE, DEPARTMENT OF | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| PR15809685 | Paramaribo/roof top unit replacement | |
| Synopsis | ||
|
US Embassy Paramaribo requires engineering and construction services to remove and replace three (3) curb mounted roof top units (RTU’s) installed on the warehouse, Workshop and Gym at the U.S Embassy Compound in Paramaribo Suriname. The buildings are one (1) story buildings located around the perimeter of the compound. The intent is for the new RTU’s to fit on the existing to remain RTU curbs. The contractor shall remove and properly dispose of demolished equipment and materials or otherwise instructed by COR or Facility manager. This work will also include any necessary modifications to the building’s roofing/flashing, electrical, and HVAC systems and their associated components. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| STATE, DEPARTMENT OF | Presolicitation | |