SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912EE25B0002 | Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22 | |
Synopsis | ||
W912EE - Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22 The work consists of furnishing all necessary plant, labor, materials, and equipment, and performing all work constructing longitudinal peaked stone toe dikes (LPSTDs) with stone tiebacks and stone fill revetment at five sites along the Ouachita River in Northeast Louisiana, south of Monroe, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, and bank stabilization work consisting of tiebacks, excavation, and backfill. The Contractor shall begin performance within .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |