OR FS FREWN602 28(1), Road 28 Reconstruction

Posted Date: Nov 02, 2026
Nov 02, 2027
Awarded Date: No Awarded Date
SetAside Type
Small Business Set Aside - Total
Solicitation ID Solicitation Title Solicitation Office
69056727B000001 OR FS FREWN602 28(1), Road 28 Reconstruction
Synopsis
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February .... Read More
Office Location Agency Name Solicitation Base Posting Type
FEDERAL HIGHWAY ADMINISTRATION Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙