NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

Posted Date: May 20, 2026
Jun 18, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12FPC326B0012 NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Synopsis

Please see Attachment 1 Specificaitons document for further details.

Tyler Dam Rehabilitation Worchester County, MA

Site Showing on:
Wednesday, May 27?? at 10:00 AM at the site

200 Robin Hill Street
Marlborough, MA 01752


The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream 
of the auxiliary spillway drop .... Read More

Office Location Agency Name Solicitation Base Posting Type
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙