Norris Cotton Restack

Posted Date: Oct 10, 2023
Due Date: Jun 27, 2023
Awarded Date: No Awarded Date
SetAside Type
8(a) Set-Aside (FAR 19.8)
Solicitation ID Solicitation Title Solicitation Office
47PB0023R0034 Norris Cotton Restack
Synopsis
Norris Cotton Restack .... Read More
Office Location Agency Name Solicitation Base Posting Type
PUBLIC BUILDINGS SERVICE Presolicitation
SetAside Type
8(a) Set-Aside (FAR 19.8)
Solicitation ID Solicitation Title Solicitation Office
47PB0023R0034 Norris Cotton Restack
Synopsis

6/7/2023 The following document is uploaded.

Final Questions and Answers - Part 2 2023 06 07

6/1/2023 The following documents  are uploaded 

Amendment 0001

Questions and answers

Pre-Conference Site Visit and Attendence 

-----------------------------------------------------------------------------------------------------------------------------------------

construction contractor shall perform all required actions in accordance with the design criteria and supporting documents. The
interior renovation/fit-out includes Demolition, Wall Assembly changes, Reflective Ceiling Plan and Sprinkler Layout,
Electrical/Data, HVAC modifications, Finishes, audio visual design, entry card reader access, Life Safety, and Phasing to maintain
occupancy throughout construction.

The Contractor will perform a wide range of activities, .... Read More

Office Location Agency Name Solicitation Base Posting Type
PUBLIC BUILDINGS SERVICE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙