SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
19EN1025Q0127 | Non-CAA space chiller and fan coil unit replacement project | |
Synopsis | ||
This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures. The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
STATE, DEPARTMENT OF | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
19EN1025Q0127 | Non-CAA space chiller and fan coil unit replacement project | |
Synopsis | ||
This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures. The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
STATE, DEPARTMENT OF | Combined Synopsis/Solicitation |