NIST Boulder Building 2 1330 Fume Hood Replacement

Posted Date: Jun 09, 2026
Jul 01, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1333ND26RNB190028 NIST Boulder Building 2 1330 Fume Hood Replacement
Synopsis

The project consists of construction services to remove and replace an existing laboratory tabletop fume hood and associated rooftop exhaust fan located in Building 2, Room 1330 at the NIST Boulder Campus. Work will include demolition and replacement of existing countertops, sink, base cabinetry, plumbing connections, and associated architectural finishes. Mechanical work includes removal of the existing fume hood, ductwork, and rooftop exhaust fan and installation of a new walk-in fume hood, hazardous exhaust fan, exhaust stack, and duct connections. Electrical work includes removal and installation of circuits serving the fume hood and exhaust fan, installation of cable tray and .... Read More

Office Location Agency Name Solicitation Base Posting Type
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙