New Manufactured Material F110 VANE ASSEMBLY,FAN,A

Posted Date: Jul 08, 2026
Aug 07, 2026
Awarded Date: No Awarded Date
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
SPRTA1-26-R-0319 New Manufactured Material F110 VANE ASSEMBLY,FAN,A
Synopsis

See presolicitation and attached solicitation for full details

Updated to incuded the correct attachment. 

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEFENSE LOGISTICS AGENCY Combined Synopsis/Solicitation
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
SPRTA1-26-R-0319 New Manufactured Material F110 VANE ASSEMBLY,FAN,A
Synopsis

SYNOPSIS – F110 VANE ASSEMBLY,FAN,A

  1. Estimated solicitation issue date 8 July 26 and estimated closing/response date 7 Aug 26.
  2. RFP #: SPRTA1-26-R-0319
  3. PR#:  FD2030-26-01016
  4. Nomenclature/Noun: VANE ASSEMBLY,FAN,A
  5. NSN: 2840-01-347-6527 PR
  6. PN: 9547M11G03
  7. Application (Engine): F110
  8. AMC: 3V
  9. History:  GE Aviation
  10. Description: Dimensions:  Length 42 in, Width 24 in, Height 36 in, Weight 100 lbs.  Material: Titanium/Steel Alloys. Function: Fan Stator contains Stage 1-3 stator vanes and shrouds.

Line Item 0001: Best Estimated Quantity: 15 EA (Qty Range: 4 EA-22 EA)

Line Item 0002: .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEFENSE LOGISTICS AGENCY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙