New High-Efficiency Natural Gas Furnace at Big Flats, NY Plant Materials Center

Posted Date: Aug 27, 2026
Sep 17, 2026
Awarded Date: No Awarded Date
SetAside Type
Small Business Set Aside - Total
Solicitation ID Solicitation Title Solicitation Office
12FPC326Q0050 New High-Efficiency Natural Gas Furnace at Big Flats, NY Plant Materials Center
Synopsis

This project covers the removal of the existing heating unit and installation of a new, high-efficiency (AFUE rating of 95% or more) natural gas furnace to provide reliable heating for the 2851 sq. ft. warehouse/shop building. The work will include all necessary labor, materials, and testing to ensure safe and optimal operation.


Removal and disposal will be off-site by contractor. Pictures are in attachment. All work shall be performed in accordance with all applicable codes, and standards (OSHA, NEC, NFPA, ASHRAE).

* The contractor shall furnish all labor, materials, equipment and supervision required to construct the .... Read More

Office Location Agency Name Solicitation Base Posting Type
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙