Negrito Well Install New Mexico

Posted Date: Sep 25, 2025
Sep 30, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
127EAV25Q0081 Negrito Well Install New Mexico
Synopsis

The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed
irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include drilling, casing installation, surface
prep, and complete assembly of a functional water system. All work must comply with applicable federal, state, and local
regulations. The well should be as close as to the existing well as possible/feasible and should be connected into the
existing distribution system. Contractor is responsible for all labor, tools, equipment, permitting, and materials.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙