SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N40080 | N40080-23-R-0022 ACQR: 6070919 - P2203, Quarters 6 Whole House Revitalization, Marine Barracks, Washington, D.C. | |
Synopsis | ||
N40080-23-R-0022 ACQR: 6070919 - P2203, Quarters 6 Whole House Revitalization, Marine Barracks, Washington, D.C. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | AWARD Notice |
SetAside Type | ||
8(a) Sole Source (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N40080 | Temporary Skilled Trade Labor Services | |
Synopsis | ||
Temporary Skilled Trade Labor Services .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | AWARD Notice |
SetAside Type | ||
8(a) Set-Aside (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N40080 | 8(a)SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO WASHINGTON, DC, MD AND VA | |
Synopsis | ||
8(a)SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO WASHINGTON, DC, MD AND VA .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | AWARD Notice |
SetAside Type | ||
8(a) Set-Aside (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N40080 | NRL-Provide Fall Protection (E-Line) Various Bldgs 1,12,43,43A,57,71,97,101,240,A59 | DEPT OF THE NAVY |
Synopsis | ||
Take special care to protect Government property. Return areas damaged as a result of construction under this contract to their original condition. In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, perform the following: a. Remove or alter existing work or facilities in such a manner as to prevent injury or damage to any portion of the existing work or facilities that remain. b. Repair or replace portions of existing work altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPT OF THE NAVY | DEPT OF DEFENSE | Combined Synopsis/Solicitation |