SetAside Type | ||
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-A | ||
Solicitation ID | Solicitation Title | Solicitation Office |
36C24623Q1012 | N041--SPD AHU Replacement Salisbury | |
Synopsis | ||
N041--SPD AHU Replacement Salisbury .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
VETERANS AFFAIRS, DEPARTMENT OF | Presolicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
36C24623Q1012 | N041--SPD AHU Replacement Salisbury | |
Synopsis | ||
How long can the unit be down to change this out? Over a weekend about 48 hours. What is the insulation specification for duct and piping? Steam for low and medium pressure 1 ½ fiberglass, CW foam 1 ½ , duct 2 wrapped What is the controls sequence for this AHU? Per the MCP for SPD they require positive air flow, humidity between 20-30%, temperature between 66-76 degrees Fahrenheit, and 4 ACH (air changes per hour Please provide a specification on the AHU to include the performance specifications for the unit.  Per the MCP for SPD .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
VETERANS AFFAIRS, DEPARTMENT OF | Combined Synopsis/Solicitation |