N041--SPD AHU Replacement Salisbury

Posted Date: Sep 19, 2023
Due Date: Oct 25, 2023
Awarded Date: No Awarded Date
SetAside Type
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-A
Solicitation ID Solicitation Title Solicitation Office
36C24623Q1012 N041--SPD AHU Replacement Salisbury
Synopsis
N041--SPD AHU Replacement Salisbury .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
36C24623Q1012 N041--SPD AHU Replacement Salisbury
Synopsis
How long can the unit be down to change this out? Over a weekend about 48 hours. What is the insulation specification for duct and piping? Steam for low and medium pressure 1 ½ fiberglass, CW foam 1 ½ , duct 2 wrapped What is the controls sequence for this AHU? Per the MCP for SPD they require positive air flow, humidity between 20-30%, temperature between 66-76 degrees Fahrenheit, and 4 ACH (air changes per hour Please provide a specification on the AHU to include the performance specifications for the unit.  Per the MCP for SPD .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙