| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 12445526Q0100 | Monongahela National Forest FR 81 Bridge Work | |
| Synopsis | ||
|
The Monongahela National Forest has a requirement for furnishing and installing one (1) single span steel girder, timber deck, and full width timber wearing surface bridge on FR 81 on the Monongahela National Forest. The work shall include, but not be limited to, construction survey and staking, E&S, clearing and grubbing, installation of cofferdam and dewatering the site, excavation for placement of riprap, removal of existing structure, installation of bridge structure, wearing surface installation, H-Pile installation, roadway subbase and aggregate, and riprap armoring. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FOREST SERVICE | Combined Synopsis/Solicitation | |