SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9128F23B0019 | Missouri River Project Office (MRPO) Asphalt Repair | |
Synopsis | ||
Missouri River Project Office (MRPO) Asphalt Repair .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9128F23B0019 | Missouri River Project Office (MRPO) Asphalt Repair | |
Synopsis | ||
***Update 0001: Amendment 0001 Updated Drawings (2 attachments). 06SEPT2023*** ***Update 0002: Amendment 0002 Updated Wage Determinations (1 attachment). 11SEPT2023*** ***Update 0003: Amendment 0003 Updated Specs and Drawings (4 attachments). 15SEPT2023*** Contractor shall provide all labor, materials, and equipment required to perform the work for the Missouri River Project Office parking roadways, parking areas, and staging areas in accordance with the Specifications and Drawings for this project. The pavement is showing significant signs of deterioration. This project will be to mill the surface asphalt removing the worn and damaged section and replace with new asphalt. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |