Military Ocean Terminal Concord (MOTCO) Berms Construction and Dredging Project

Posted Date: Jul 14, 2025
Jul 24, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912P725BA013 Military Ocean Terminal Concord (MOTCO) Berms Construction and Dredging Project
Synopsis

14 July 2025 Update: Post additional RFI responses. See attachment MOTCO_Additional_RFIs_07142025.pdf

*****************************************************************************************************************************************

10 July 2025 Update: Posted RFI responses, and Amendment 0002.

Following files are referenced in the RFI responses, but due to file size limit and file type restriction, this document will be provided via DOD Safe. Please send a request to lisa.i.ip@usace.army.mil to obtain a copy.

- MOTCO_Dredging_Wharf_2-3_Site_Visit_Photos.pdf,

- MOTCO_Design_Analysis-BP2-100-Geotech_Report_Only.pdf,

- MOTCO_2019_Maintenance_Dredging_SAR.pdf,

- MOTCO Topo 2015 LiDAR-Standard.zip,

- SF_MOTCO_20250402_CS_5Avg_MLLW_(Wharves_2-3).zip,

- SF_MOTCO_20250402_CS_15Avg_MLLW_(Wharves_2-3).zip,

- Installation Integrated Resource Management Plan,

- DDSD_MOTCO_Wastewater_Permit_018117-S_Sept2023-April2027.pdf

***************************************************************************************************************************************************************************************************

Amendment 0001 and site visit .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912P725BA013 Military Ocean Terminal Concord (MOTCO) Berms Construction and Dredging Project
Synopsis

10 July 2025 Update: Posted RFI responses, and Amendment 0002.  Bid due date and time is 24 July 2025 @ 01:00 PM PDT.  Public bid opening date/time is 24- JUL-2025 @ 02:00 PM PDT.

Following files are referenced in the RFI responses, but due to file size limit and file type restriction, this document will be provided via DOD Safe. Please send a request to lisa.i.ip@usace.army.mil to obtain a copy.

- MOTCO_Dredging_Wharf_2-3_Site_Visit_Photos.pdf,

- MOTCO_Design_Analysis-BP2-100-Geotech_Report_Only.pdf,

- MOTCO_2019_Maintenance_Dredging_SAR.pdf,

- MOTCO Topo 2015 LiDAR-Standard.zip,

- SF_MOTCO_20250402_CS_5Avg_MLLW_(Wharves_2-3).zip,

- SF_MOTCO_20250402_CS_15Avg_MLLW_(Wharves_2-3).zip,

- Installation Integrated Resource Management Plan,

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙