MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA

Posted Date: May 15, 2025
Jun 18, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
N6247024R0062 MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
Synopsis

Amendment 0005 is issued to:


1. Respond to PPIs.
2. Revise Specifications.
3. Revise Drawings.
4. Provide attachment.

Amendment 0004 is issued to:

1. Extend the proposal due date.
2. Set cut-off date for PPIs.
3. Respond to PPIs.
4. Revise Specifications.
5. Revise Drawings.
6. Provide attachments.
7. Revise the Solicitation

Amendment 0003 is issued to:

1. Respond to PPIs.
2. Revise Specifications.
3. Revise Drawings.
4. Provide attachments.
5. Revise the Solicitation.
6. Add FAR Clause 52.216-4 .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
N6247024R0062 MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
Synopsis

Amendment 0004 is issued to:

1. Extend the proposal due date.
2. Set cut-off date for PPIs.
3. Respond to PPIs.
4. Revise Specifications.
5. Revise Drawings.
6. Provide attachments.
7. Revise the Solicitation

Amendment 0003 is issued to:

1. Respond to PPIs.
2. Revise Specifications.
3. Revise Drawings.
4. Provide attachments.
5. Revise the Solicitation.
6. Add FAR Clause 52.216-4 Economic Price Adjustment-Material

Amendment 0002 is issued to:

1. Extend the proposal due date.
2. Respond to PPIs.
3. Revise Specifications.
Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
N6247024R0062 MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
Synopsis

Amendment 0002 is issued to:

1. Extend the proposal due date.
2. Respond to PPIs.
3. Revise Specifications.
4. Revise Drawings.
5. Revise the solicitation.
6. Provide clause revisions.
7. Provide attachments.

Amendment 0001 is issued to incorporate the follow ing:
1. Provide Site Visit Information
2. Provide attachments
2. Insert FAR Clause 52.223-23, Sustainable Products and Services

Refer to attachment labeled N6247024R0062 for the Solicitation document.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
N6247024R0062 MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
Synopsis

Amendment 0001 is issued to incorporate the follow ing:
1. Provide Site Visit Information
2. Provide attachments
2. Insert FAR Clause 52.223-23, Sustainable Products and Services

Refer to attachment labeled N6247024R0062 for the Solicitation document.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
N6247024R0062 MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
Synopsis

Please refer to the attached Pre-solicittion notice titled PRE-SOL NOTICE 1-2-13-25 - Final.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙