MCC Chicago - Repair Sewer Line

Posted Date: Sep 16, 2025
Sep 23, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
15BFA025Q00000257 MCC Chicago - Repair Sewer Line
Synopsis

9/16/2025 AMENDMENT 0001

A. Incorporate Site Visit Sign in Sheet and Meeting Minutes from September 3, 2025.
B. Incorporate photos from September 3 Site Visit.
No other changes at this time.

The Federal Bureau of Prisons (FBOP) herein issues solicitation 15BFA025Q00000257 for the award of a firm-fixed-price construction contract for a project entitled Repair Sewer Line at the Metropolitan Correctional Complex (MCC) Chicago, located in Chicago, Illinois. MCC Chicago is a federally owned facility located at 71 W. Van Buren Street, Chicago, IL 60605. The project consists of the following: 

The Metropolitan Correctional Center (MCC) Chicago .... Read More

Office Location Agency Name Solicitation Base Posting Type
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙