| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z0G126BCGA003NP | MAJOR REPAIRS BOILER PLANT | |
| Synopsis | ||
|
MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z0G126BCGA003NP | MAJOR REPAIRS BOILER PLANT | |
| Synopsis | ||
|
MAJOR REPAIRS TO BOILER PLANT, PSN 21590583 Contractor shall furnish all labor, material, equipment, and supervision necessary to renovate and provide new kitchenette, toilet, shower and locker room facilities in the Boiler Plant and option bid work at the U.S. Coast Guard Academy. Work includes removal of the existing kitchen cabinets, toilet fixtures and portions of existing concrete floor slab for new work. Prepare selected existing walls and provide waterproofing. Provide new walls, doors, frames, hardware, ceilings, finishes, toilet accessories, lighting, plumbing, HVAC and electrical to support all new work. There are four (4) option items; Option 1: Highland .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |