LXEZ221048 Repair Restrooms Contracting Office B95

Posted Date: May 06, 2025
May 30, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA527025R0007 LXEZ221048 Repair Restrooms Contracting Office B95
Synopsis
Conformed Solicitation (SF1442) adjusting due date from Amendment 0001 for proposals, Repair of Restrooms in Building 95, Kadena AB .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA527025R0007 LXEZ221048 Repair Restrooms Contracting Office B95
Synopsis
Provide all labor, materials, and equipment necessary to repair four restrooms in Building 95 to provide a reliable and efficient plumbing system for 18th Contracting Squadron (18 CONS) Office. Architectural repairs include replacement of interior finishes including ceiling, wall and flooring, replacement of doors, windows, bathroom vanities, specialties such as partitions, and bathroom and janitorial accessories. Reconfigure the existing interior spaces on the first floor to provide minimum clearances, turning spaces, fixture spacing, and stall dimensions to accommodate personnel in wheelchairs. Mechanical repairs include replacement of bathroom exhaust fans and controls, replacement of plumbing fixtures, water heater, entire domestic water .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
SetAside Type
Local Area Set-Aside (FAR 26.2)
Solicitation ID Solicitation Title Solicitation Office
FA527025R0007 REPAIR RESTROOMS CONTRACTING OFFICE B95
Synopsis

The project scope consists of, but is not limited to, providing all field investigations, 
surveys, design, plant, labor, supervision, materials, equipment, supplies, transportation, 
third-party services, and other work necessary to design and execute construction work defined in 
this Statement of Work and the attached documents. The work includes all necessary finishing work 
to provide the Government with a final product that is fully functional and leaves no areas of the 
facility that appear incomplete or unfinished.

Provide all labor, materials, and equipment necessary to repair four restrooms in Building 95 to 
provide a .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙