N4008525R2655 | LP-40 Install In-Line Receipt Filtration, Naval Station Norfolk, Norfolk, Virginia | |
Synopsis | ||
The work includes demolition and removal of an aboveground fuel filtration system, construction of a new filtration system, electrical cabling, cabinetry, and incidental related work located at the LP Fuel Farm at Naval Station Norfolk, Norfolk, Virginia. The existing fuel filtration system includes a centrifugal pump, valves, piping, and filtration vessels. Installation of the new fuel filtration system includes a vertical centrifugal pump, three vertical filter/separators, control valves, piping, and supports. All work is located within and existing concrete slab with curb containment. No excavation is required, however; electrical work is included to accommodate the new fuel filtration system and electrical requirements. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008525R2655 | LP-40 Install In-Line Receipt Filtration, Naval Station Norfolk, Norfolk, Virginia | |
Synopsis | ||
The work includes demolition and removal of an aboveground fuel filtration system, construction of a new filtration system, electrical cabling, cabinetry, and incidental related work located at the LP Fuel Farm at Naval Station Norfolk, Norfolk, Virginia. The existing fuel filtration system includes a centrifugal pump, valves, piping, and filtration vessels. Installation of the new fuel filtration system includes a vertical centrifugal pump, three vertical filter/separators, control valves, piping, and supports. All work is located within and existing concrete slab with curb containment. No excavation is required, however; electrical work is included to accommodate the new fuel filtration system and electrical requirements. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008525R2655 | LP-40 Install In-Line Receipt Filtration, Naval Station Norfolk, Norfolk, Virginia | |
Synopsis | ||
The work includes demolition and removal of an aboveground fuel filtration system, construction of a new filtration system, electrical cabling, cabinetry, and incidental related work located at the LP Fuel Farm at Naval Station Norfolk, Norfolk, Virginia. The existing fuel filtration system includes a centrifugal pump, valves, piping, and filtration vessels. Installation of the new fuel filtration system includes a vertical centrifugal pump, three vertical filter/separators, control valves, piping, and supports. All work is located within and existing concrete slab with curb containment. No excavation is required, however; electrical work is included to accommodate the new fuel filtration system and electrical requirements. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008525R2655 | LP-40 Install In-Line Receipt Filtration, Naval Station Norfolk, Norfolk, Virginia | |
Synopsis | ||
The work includes demolition and removal of an aboveground fuel filtration system, construction of a new filtration system, electrical cabling, cabinetry, and incidental related work located at the LP Fuel Farm at Naval Station Norfolk, Norfolk, Virginia. The existing fuel filtration system includes a centrifugal pump, valves, piping, and filtration vessels. Installation of the new fuel filtration system includes a vertical centrifugal pump, three vertical filter/separators, control valves, piping, and supports. All work is located within and existing concrete slab with curb containment. No excavation is required, however; electrical work is included to accommodate the new fuel filtration system and electrical requirements. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |