Lock and Dam 8 Spillway Concrete Supply

Posted Date: Sep 24, 2025
Oct 20, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W912ES25QA084 Lock and Dam 8 Spillway Concrete Supply
Synopsis

The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for a contractor to deliver mixed concrete to the Minnesota-side of the spillway located at Lock and Dam 8 in Genoa, WI.  These deliveries will take place during the winter months (November 1 – March 1) over a two-year period and will require backing across the 20’ wide Reno spillway.  Minimum quantity will be 350 cubic yards but could increase to up to 450 cubic yards.  Deliveries will be in 30-yard batches (+/- 10%) delivered to the work site.

The North American Industry Classification System (NAICS) .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W912ES25QA084 Lock and Dam 8 Spillway Concrete Supply
Synopsis

This is a pre-solicitation notice and not a request for quotes, bids, or proposals.  The purpose of this is to give industry a heads-up that a requirement will be forthcoming.  A solicitation will be posted that includes further requirement specifications and contract terms and conditions.

The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for a contractor to deliver mixed concrete to the Minnesota-side of the spillway located at Lock and Dam 8 in Genoa, WI.  These deliveries will take place during the winter months (November 1 – March 1) over a two-year period and .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙