Little Goose Powerhouse Unit 3

Posted Date: Aug 18, 2025
Sep 15, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912EF25BA013 Little Goose Powerhouse Unit 3
Synopsis
This work is for the repair of an oil leak at the turbine shaft to Kaplan hub connection of Little Goose Powerhouse Unit 3. Work involves containment of three leak paths as described in the upcoming solicitation package in SECTION 48 13 13.04 26 EXISTING TURBINE COMPONENT, REFURBISHMENT AND REPLACEMENT of the technical specifications. Repairs include fabrication and installation of a sealing ring at the hub connection to the turbine shaft (OD of flange); installation of stainless-steel tubing; and welding of thirty (30) caps for sealing the tops of the coupling bolts and nuts. The Contractor will not be required to disassemble or reassemble any existing components. The work will take place in the powerhouse of Little Goose Dam. Little Goose Dam is located on the Lower Snake River near Starbuck, WA. The powerplant consists of six main generating units. This work will only be required for Unit 3. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙