SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6973GH-25-R-00125 | Amend 001 - IIJA LIT ATCT, HVAC, Replace Boiler, Controls System | |
Synopsis | ||
Amendment 001: The purpose of this amendment is to extend the SIR closing date. ------------------------------------------------------------------------------------------------ Questions and Answers are hereby posted in the Attachments (17 Questions and Answers) ------------------------------------------------------------------------------------------------ BRAND NAME: Schneider Electric Ecostruxure System
The Federal Aviation Administration’s, Bill and Hillary Clinton National Airport, Little Rock Air Traffic Control Tower (LIT ATCT) has three (3), 15-ton split computer room system HVACs that shall be replaced. The two 5 ton split computer room HVACs for the Power Conditioning System (PCS) in the .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL AVIATION ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6973GH-25-R-00125 | LIT ATCT, HVAC, Replace Boiler, Controls System | |
Synopsis | ||
BRAND NAME: Schneider Electric Ecostruxure System
The Federal Aviation Administration’s, Bill and Hillary Clinton National Airport, Little Rock Air Traffic Control Tower (LIT ATCT) has three (3), 15-ton split computer room system HVACs that shall be replaced. The two 5 ton split computer room HVACs for the Power Conditioning System (PCS) in the Environmental Support Unit Building (ESU) shall also be replaced. The boiler for the facility shall be removed and replaced. Additionally, all controls shall be replaced. The system, controls, and computer shall replace all existing .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL AVIATION ADMINISTRATION | Combined Synopsis/Solicitation |