Kendall Gravel Pit Development

Posted Date: Apr 03, 2024
Due Date: Jun 12, 2024
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240LT24R0036 Kendall Gravel Pit Development
Synopsis

The Bridger Teton National Forest (BTNF), Kendall Gravel Pit Development project consists of pit development, crushing, addition of commercial bentonite, stockpiling of road surface material, and pit reclamation. The material for this project shall be produced by developing and excavation in the pit area on site. Any small trees or brush that exist in the proposed excavation area shall be piled on site at an approved location. All finished side slopes shall be 3:1. The bottom of the excavation site that is not used for floor of stockpile shall be scarified and sloped to drain out of the pit and away from any streams, rivers, or lakes.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙