SetAside Type | ||
No Set aside used | ||
Solicitation ID | Solicitation Title | Solicitation Office |
KRS-369604-JK | Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear | |
Synopsis | ||
On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information. The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
ENERGY, DEPARTMENT OF | Combined Synopsis/Solicitation |