| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| NAVMWR-25-R-0007 | Joint Base Pearl Harbor-Hickam Wave Attenuator Install | |
| Synopsis | ||
|
This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and 1. Design of Wave Attenuator
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| NAVMWR-25-R-0007 | Joint Base Pearl Harbor-Hickam Wave Attenuator Install | |
| Synopsis | ||
|
This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and 1. Design of Wave Attenuator
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| NAVMWR-25-R-0007 | Joint Base Pearl Harbor-Hickam Wave Attenuator Install | |
| Synopsis | ||
|
This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and 1. Design of Wave Attenuator
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| NAVMWR-25-R-0007 | Joint Base Pearl Harbor-Hickam Wave Attenuator Install | |
| Synopsis | ||
|
This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and 1. Design of Wave Attenuator
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| NAVMWR-25-R-0007 | Joint Base Pearl Harbor-Hickam Wave Attenuator Install | |
| Synopsis | ||
|
This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and 1. Design of Wave Attenuator
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |