J059--Building 19 SCADA Upgrades

Posted Date: Dec 08, 2025
Dec 18, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
36C24126Q0041 J059--Building 19 SCADA Upgrades
Synopsis
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-06; October 1, 2025. The most recent .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
SetAside Type
Service-Disabled Veteran-Owned Small Business Set Aside
Solicitation ID Solicitation Title Solicitation Office
36C24126Q0041 J059--689-26-1-4810-0020: Building 19 SCADA Upgrades (VA-25-00092807)
Synopsis
36C24126Q0041 - J059--SCADA Upgrades - Building 19 Q&A Is the site visit on 3 Nov mandatory to submit an offer? Yes for those who can t attend, will there be drawings/pictures of the SCADA system? No, photos can be taken during walk-thru Upon reviewing the solicitation and scope of work, it states that the contractor or technician must be OEM certified. However, the specific manufacturer required for this project is not clearly indicated. We are speculating that it may be Schweitzer Engineering Laboratories (SEL). Could you please confirm if SEL is indeed the specified manufacturer? Yes, there are Schwitzer relays kindly request any available drawings, as-built diagrams, control schematics, or additional documentation related to the current SCADA and switchgear control systems in Building 19 The only available information are simple one-lines of the switchgear B-19 3rd floor one line diagram B-19 3rd floor one line diagram drawing attached. .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙