| SetAside Type | ||
| Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-A | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 36C24626B0029 | J041--558-22-172, Replace Chillers in AHU 1 and 2 | |
| Synopsis | ||
|
STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| VETERANS AFFAIRS, DEPARTMENT OF | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-A | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 36C24626B0029 | J041--558-22-172, Replace Chillers in AHU 1 and 2 | |
| Synopsis | ||
|
J041--558-22-172, Replace Chillers in AHU 1 and 2 .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| VETERANS AFFAIRS, DEPARTMENT OF | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Service-Disabled Veteran-Owned Small Business Set Aside | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 36C24626B0029 | J041--558-22-172, Replace Chillers in AHU 1 and 2 | |
| Synopsis | ||
|
Project Number: 558-22-172--Replace Chillers for AHU 1 and 2 replaces the aging auxiliary chillers for air handler units 1 and 2, and all associated equipment identified in design for replacement or upgrade. The project intends to replace the physical control devices on the air handling units and the roof-mounted chilled water system serving the air handling units 1 and 2. The work required will be related to chillers, pumps, glycol make-up and auxiliaries, energy management controls, and electrical work. The new physical devices must conform to VA Specification 23 09 23 and be integrated into the controllers. Estimated construction magnitude .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| VETERANS AFFAIRS, DEPARTMENT OF | Presolicitation | |