Intracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida

Posted Date: Sep 25, 2025
Oct 10, 2025
Awarded Date: Sep 25, 2025
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W912EP25CA013 Intracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida
Synopsis

Project will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of
Jupiter and St. Lucie Inlets. These two areas are approximately 16 IWW channel miles apart. The Jupiter Inlet
portion of the project consists of maintenance dredging approximately 100,000 cubic yards from IWW Cuts P-1
through P-9. The excavated material will be piped to the beach placement area immediately south of Jupiter
Inlet. The St. Lucie Inlet work consists of maintenance dredging approximately 200,000 cubic yards from IWW
Cuts M-1 through M-6 and OWW cut-1. Excavated material will be placed in the St. Lucie inshore
impoundment basin for future use as beach renourishment fill. Incidental work for both project areas will
include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be
required at the Jupiter Inlet beach site.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY AWARD Notice
An error has occurred. This application may no longer respond until reloaded. Reload 🗙