Immersion Tank Replacement at FRCE

Posted Date: Mar 19, 2026
Mar 26, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N68520-26-SIMACQ-JC00000-0172 Immersion Tank Replacement at FRCE
Synopsis

***QUESTIONS & ANSWERS***

1.  Lifting System / Parts Handling Intent

QUESTION:  SOW Section 3.3.2 references a platform that will raise and lower utilizing a hydraulic system with minimum 3-inch linear shafts and bearings mounted to the machine base.

Please confirm whether the Government intends the replacement system to include:

  1. an integrated vertical lifting platform as part of the immersion tank system; or
  2. a separate external lifting/handling arrangement.

ANSWER: An integrated platform.

If the 4,000-lb parts are expected to be loaded using existing shop equipment, please advise whether any .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙