Hot Water Boiler Replacement

Posted Date: Jun 24, 2025
Jul 18, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
70Z08125QELIZ0019 Hot Water Boiler Replacement
Synopsis

The Contractor shall provide all supervision, labor, equipment, parts and materials to disconnect and remove 2 (two) existing failed natural gas fired high efficiency condensing hot water boilers and install 1 (ONE) new high efficiency condensing natural gas fired hot water boiler. The new boiler shall be connected to the existing piping system, natural gas piping, electrical and control wiring. 

This work is located at the USCG Base Elizabeth City, NC in building 87, Paint Facility. 

All quotes must be submitted by 1100 Eastern Time on July 18, 2025. All quotes must be submitted via email to luis.r.perez1@uscg.mil. .... Read More

Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙