Holt Lock Monolith R14 Restoration

Posted Date: May 16, 2025
Jun 04, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W9127825RA015 Holt Lock Monolith R14 Restoration
Synopsis
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. Amendment 0001 is posted 16 May 2025 to update the Table of Contents, Bid Schedule, Explanation of Bid Schedule, and several sections within the specifications as well as drawings. The response date has been extended to 4 June 2025. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W9127825RA015 Holt Lock Monolith R14 Restoration
Synopsis

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W9127825RA015 Holt Lock Monolith R14 Restoration
Synopsis
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation