HJA Electrical Demo on Cabin

Posted Date: Sep 04, 2024
Due Date: Sep 28, 2024
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240BJ24Q0030 HJA Electrical Demo on Cabin
Synopsis
HJA Electrical Demo on Cabin .... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240BJ24Q0030 HJA Electrical Demo on Cabin
Synopsis

Remove two electrical panels and the current electrical wiring within the walls, ceiling, and floors of the maintenance residence (in preparation of a new electrical panel and rewiring the structure). This will require the removing of drywall throughout the residence to access electrical wires. The electrical wiring has been degraded by rodents chewing into the wiring within the walls & floors, creating fire hazards and a potential for electrocution. Megohmmeter (megger test) potentially viable electrical wires (confirm insulation viability), i.e. wall light switch to ceiling light and outlets that do not have any signs of rodent intrusion. Salvage wood wainscoting .... Read More

Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙