SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FXSB23-1050 | Hangar 5 Turf | |
Synopsis | ||
Project to install fitness flooring (artificial turf) in the infield of the track in the main hangar bay at Building 7309. The installation requires extensive concrete slab preparation and repair to obtain a suitable surface for fitness flooring to adhere and maintain warranty. Lead Base Paint (LBP) on concrete would be abated, entire concrete surface would be leveled via grinding and all spalls and cracks would be repaired. This requirement must meet all specifications outlined in the Statement of Work and Turf System Specifications. The estimated Period of Performance for this project is 365 calendar days from issuance of .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |