Hangar 5 Turf

Posted Date: Aug 10, 2023
Due Date: Sep 26, 2023
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
FXSB23-1050 Hangar 5 Turf
Synopsis

Project to install fitness flooring (artificial turf) in the infield of the track in the main hangar bay at Building 7309. The installation requires extensive concrete slab preparation and repair to obtain a suitable surface for fitness flooring to adhere and maintain warranty. Lead Base Paint (LBP) on concrete would be abated, entire concrete surface would be leveled via grinding and all spalls and cracks would be repaired.

This requirement must meet all specifications outlined in the Statement of Work and Turf System Specifications. The estimated Period of Performance for this project is 365 calendar days from issuance of .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙