H245--Vancouver Boiler Emission Compliance

Posted Date: Jul 23, 2025
Aug 15, 2025
Awarded Date: No Awarded Date
SetAside Type
Service-Disabled Veteran-Owned Small Business Set Aside
Solicitation ID Solicitation Title Solicitation Office
36C26025Q0716 H245--Vancouver Boiler Emission Compliance
Synopsis
Statement of Work Boiler Emission Compliance, VA Portland HCS Vancouver Campus Perform a boiler emission test on 3 boilers in Building 3, VA Portland HCS Vancouver Campus Test to determine compliance with permit 19-3332 issued by Southwest Clean Air Agency (SWCAA) and 40 CFR 60. Perform three runs of Volumetric Flow Rate test per Environmental Protection Agency (EPA) M1 and M2. Perform three runs of O2, CO2, NOx, and CO test per EPA M3A, 7E and 10 Perform three runs of Water Vapor test per EPA M4 Perform TC Calibration per EPA ALT-011 This test is required every 5 years by SWCAA to maintain the permit for operation on the Vancouver boilers. The Vancouver boilers provide steam to maintain laundry operations, sterile processing, heating hot water and hot water to 5 buildings. .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙