| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W519TC27QA007 | Granite Surface Plate Calibration and lapping - with Q&As | |
| Synopsis | ||
|
Q&A's: 1. CLINs 0001 through 0005 (pages 3-5) are each one firm-fixed-price lot for "Inspection and calibration." SOW paragraphs 1 and 4.2 (pages 1-2) call for lapping only of plates that are out of specification, the QASP (Attachment 0002, page 1) says lapping repairs must be authorized by the CO or COR, and Section G, paragraph 6.a (page 12) asks for labor rates. Should each year's lot price cover inspection and calibration of all 18 plates, with lapping priced separately (for example, a per-plate price or an hourly labor rate) and billed only when authorized? Or should the lot price .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W519TC27QA007 | Granite Surface Plate Calibration and lapping - updated Docs | |
| Synopsis | ||
|
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W519TC27QA007 | Granite Surface Plate Calibration and lapping | |
| Synopsis | ||
|
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |