Granite Surface Plate Calibration and lapping - with Q&As

Posted Date: Oct 27, 2026
Nov 09, 2026
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W519TC27QA007 Granite Surface Plate Calibration and lapping - with Q&As
Synopsis
Q&A's: 1. CLINs 0001 through 0005 (pages 3-5) are each one firm-fixed-price lot for "Inspection and calibration." SOW paragraphs 1 and 4.2 (pages 1-2) call for lapping only of plates that are out of specification, the QASP (Attachment 0002, page 1) says lapping repairs must be authorized by the CO or COR, and Section G, paragraph 6.a (page 12) asks for labor rates. Should each year's lot price cover inspection and calibration of all 18 plates, with lapping priced separately (for example, a per-plate price or an hourly labor rate) and billed only when authorized? Or should the lot price .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W519TC27QA007 Granite Surface Plate Calibration and lapping - updated Docs
Synopsis
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W519TC27QA007 Granite Surface Plate Calibration and lapping
Synopsis
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙