Government Requirement for Advanced Power and Energy (GRAPE)

Posted Date: May 28, 2025
Jul 28, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

This effort is needed to maximize the ability of DAF installations to achieve mission assurance through energy assurance by adding Large Capacity Energy Storage. The focus of this program is to research and demonstrate the integration of new installation energy technologies that can be demonstrated at a DAF location to provide increased operational resilience.

Due to the austere location of the installation, new technology would need to operate in extreme low temperatures of -60°F. Large Capacity Energy Storage offers many economic and operational benefits, such as improved power quality and stability, and reduced dependence on generators, and reduce the logistics required to bring in fuel for generators.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis
Government Requirement for Advanced Power and Energy (GRAPE) .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

To employ new battery-based electric flightline support equipment and vehicles, charging infrastructure must be installed. A Phase 1 Flightline Electrification Charging Infrastructure Study was conducted at Holloman AFB and Robins AFB to prepare the government for a Phase 2 Demonstration at these sites.


The purpose of the Phase 2 Demonstration effort is to install charging infrastructure and conduct a demonstration at these sites to define charging standards, operational approaches, technologies, and risks. This learning will enable a smoother and faster transition to a future Phase 3 wide-spread implementation effort.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

To employ new battery-based electric flightline support equipment and vehicles, charging infrastructure must be installed. A Phase 1 Flightline Electrification Charging Infrastructure Study was conducted at Holloman AFB and Robins AFB to prepare the government for a Phase 2 Demonstration at these sites.


The purpose of the Phase 2 Demonstration effort is to install charging infrastructure and conduct a demonstration at these sites to define charging standards, operational approaches, technologies, and risks. This learning will enable a smoother and faster transition to a future Phase 3 wide-spread implementation effort.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

To employ new battery-based electric flightline support equipment and vehicles, charging infrastructure must be installed. A Phase 1 Flightline Electrification Charging Infrastructure Study was conducted at Holloman AFB and Robins AFB to prepare the government for a Phase 2 Demonstration at these sites.


The purpose of the Phase 2 Demonstration effort is to install charging infrastructure and conduct a demonstration at these sites to define charging standards, operational approaches, technologies, and risks. This learning will enable a smoother and faster transition to a future Phase 3 wide-spread implementation effort.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

To employ new battery-based electric flightline support equipment and vehicles, charging infrastructure must be installed. A Phase 1 Flightline Electrification Charging Infrastructure Study was conducted at Holloman AFB and Robins AFB to prepare the government for a Phase 2 Demonstration at these sites.


The purpose of the Phase 2 Demonstration effort is to install charging infrastructure and conduct a demonstration at these sites to define charging standards, operational approaches, technologies, and risks. This learning will enable a smoother and faster transition to a future Phase 3 wide-spread implementation effort.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 FA8650-18-S-5008; Call 001; B-52 Tow Bar
Synopsis
FA8650-18-S-5008; Call 001; B-52 Tow Bar .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE AWARD Notice
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

Technology Transition of KC-135 Vertical Wiper Hardware Design to Deployment Hardware

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE AWARD Notice
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA8650-18-S-5008 Government Requirement for Advanced Power and Energy (GRAPE)
Synopsis

Amendment 4 to original ARA announcement

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙