GAOA South Park Office Rehab Pike National Forest

Posted Date: Jul 08, 2026
Aug 11, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240BH26Q0028 GAOA South Park Office Rehab Pike National Forest
Synopsis

Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery for the following:
1. Remove and install new standing seam metal roof; including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts.
2. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits.
3. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows. Also, install new insulation in the areas where the ceiling is dropped.
4. Install additional communication outlets and electrical for telecom.
5. Install chain link fence, personnel gate, motorized gate, and associated electrical and safeties.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙