FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

Posted Date: Aug 04, 2025
Sep 05, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912DR25BA006 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Synopsis
The project consists of maintenance dredging approximately up to 2,300,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The dredging depth for all channels is between 35 and 50 feet mean lower low water (MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately up to 1,830,000 cy will be dredged from the Maryland approach channels (Brewerton Eastern Extension, Swan Point, Craighill and possibly Tolchester Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙