SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912DW25R0002 | FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222 | |
Synopsis | ||
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require:
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |