| SetAside Type | ||
| Small Business Set Aside - Total | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912HQ26S0066 | Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS Battery Replacement | |
| Synopsis | ||
|
The U.S. Army Corps of Engineers Headquarters has a requirement to to execute the full start-up and commissioning of existing data center environmental control systems based on original design specifications, as well as the replacement and EPA-compliant disposal of batteries for an Eaton Uninterruptible Power Supply (UPS) system.This procurement will be awarded under Simplified Acquisition Procedures. There will be one site visit at the Cude Building 2592 on Tuesday, 1 September. The site visit is required. All contractors will need to meet at the CUDE Building 2592, 7701 Telegraph Road, Alexandria, Virginia 22315 for check-in beginning at 0900. All contractors who .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |