FTG247 Replace UPS at IDT1

Posted Date: Oct 01, 2025
Oct 31, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W911KB26RA011 FTG247 Replace UPS at IDT1
Synopsis
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 80KVA UNINTERRUPTABLE POWER SYSTEMS (UPSS) WITH DISTRIBUTED REDUNDANT 75 KILOVOLT-AMPERE (KVA) UPSS. NEW UPS PANELBOARDS WILL BE ADDED TO ALLOW FOR REDUNDANT RECEPTACLES FOR ALL THE MISSION EQUIPMENT WITHIN THE HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP)-SHIELDED EQUIPMENT ROOM. EMERGENCY POWER OFF (EPO) WILL BE UPGRADED TO THE LATEST MDA GMD STANDARDS. POWER CONTROL AND MONITORING SYSTEM (PCMS) AND POWER QUALITY MONITORING SYSTEM (PQMS) WILL ALSO BE EXTENDED INTO IDT1 FROM THE FORT GREELY POWER PLANT (FPP).TO RECEIVE A COPY OF THE SOLICITATION AND AMENDMENTS PLEASE EMAIL BRITTNEY MORRISON AT BRITTNEY.MORRISON@USACE.ARMY.MIL AND MICHELLE NELSEN AT MICHELLE.NELSEN@USACE.ARMY.MIL .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙