SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9128F24R0049 | Fort Randall Powerhouse Elevator Replacement, Fort Randall Dam, Pickstown, South Dakota | |
Synopsis | ||
Fort Randall Powerhouse Elevator Replacement, Fort Randall Dam, Pickstown, South Dakota .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9128F24R0049 | Fort Randall Powerhouse Elevator Replacement, Fort Randall Dam, Pickstown, South Dakota | |
Synopsis | ||
**UPDATED 13 Mar 2024 - On or About date for this solicitation is moved to mid-June 2024. See attachment**The contractor shall provide material and labor in order to complete required work to Modernize FR Powerhouse Elevator located at Fort Randall Powerhouse Structure. The work shall include, but is not limited to, replacement of all mechanical and electrical components inside the elevator machinery room and installation of a new HVAC unit inside the elevator machinery room. The contractor will be required to remove the existing elevator mechanical and electrical equipment which may contain hazardous materials such as asbestos and lead-based paint. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9128F24R0049 | Fort Randall Powerhouse Elevator Replacement, Fort Randall Dam, Pickstown, South Dakota | |
Synopsis | ||
The contractor shall provide material and labor in order to complete required work to Modernize FR Powerhouse Elevator located at Fort Randall Powerhouse Structure. The work shall include, but is not limited to, replacement of all mechanical and electrical components inside the elevator machinery room and installation of a new HVAC unit inside the elevator machinery room. The contractor will be required to remove the existing elevator mechanical and electrical equipment which may contain hazardous materials such as asbestos and lead-based paint. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |