| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912QR-26-R-A028 | Fort Buchanan Microgrid | |
| Synopsis | ||
|
This is a Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW of new diesel generators and 4 MWh battery energy storage system (BESS), as an option. In addition, the project will install a microgrid control system including, but not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying and fiber optic communication connections. The project will install twelve 12,000-gallon above-ground, ballistic-resistant, diesel fuel tanks with a fuel polishing system to sustain critical operations continuously for 14 days. The microgrid will include integration of existing large-scale onsite generation (4.65 MW from .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |