FOPR for GLEN 26-1004 CSOF Bollards

Posted Date: Aug 04, 2026
Aug 20, 2026
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
FA255026R0050 FOPR for GLEN 26-1004 CSOF Bollards
Synopsis
Schriever SFB (SSFB) requires construction for a section of the south restricted area (RA) fencings. This section of the RA fencing and operable sliding gates are currently not meeting the most recent anti-terrorism and force protection (ATFP) requirements per the Unified Facilities Guide Specifications (UFGS) and base defense plan (BDP) and requires renewal. The total Period of Performance (PoP) is 180 days from Notice-To-Proceed (NTP). Provide services to develop shop drawings and provide construction services to procure and install concrete filled bollards along selected section of the RA fence line shown in Figure 1. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙